Project Type: Government – Airport Renovation

Location: California, San Diego

Services Provided: BIM Framing, BIM Modeling

Project Profile:
The terminal expansion consists of 430,000-square-foot of new public and non-public areas, providing 10 additional contact aircraft gates, while the airside pavement expansion incorporates an area of 1.5 million-square-foot including aircraft parking, aprons, taxiways and taxi lanes. The project was designed to achieve a LEED Gold rating.

Kelar Pacific Role:
Provided BIM modeling and coordination for exterior and interior framing, elevators, piles, and a portion of the underground utilities. A variety of technology was used including Revit®, Navisworks® and Civil 3D®.

Let's Discuss Your Next Project

Ready to take your project to the next level? Let’s make it together.

Our Services

BIM Services

BIM services involve creating and managing digital building models to improve design, construction, and collaboration.

3D laser scanning

Reality capture uses technologies like 3D scanning and photogrammetry to create accurate digital models of physical spaces.

Construction Scheduling

Construction scheduling plans tasks and timelines to complete a project efficiently.

Robotic Total Station layout

Field layout involves marking the physical locations of structures on a construction site based on design plans.