• A three story building with floor to ceiling windows and a raised front wall

Details

  • Project SWCCD Wellness & Aquatic Center
  • Services BIM Framing, BIM Modeling, Total Station Layout
  • Project Profile This project replaced the existing gymnasium and existing aquatic facilities at Southwestern College. The building houses a 2,500-seat gymnasium, fitness labs, cardio-workout rooms, training and testing rooms, offices, locker rooms and multi-purpose exercise rooms as well as three pools.
  • Kelar Pacific Role Prepare complete BIM model for metal stud framing and acoustical ceiling grid & posts. Prepare and present models in any required format for coordination. Update models, and BIM Models prepare point-layout for field layout using a robotic total station.

Description