• viewport of BIM drawings

Details

  • Project Type Mixed Use - New Build
  • Services Provided Total Station Layout
  • Project Profile A $250 million housing-retail project in downtown San Diego. The building area for the project was a 3.5 acre parcel featuring a 37-story mixed-use tower. The project includes 49,000-square-feet of retail and 711 residential units.
  • Kelar Pacific Role Prepared all wall framing CAD drawings for Robotic Total Station Field layout by inserting digital points and assisted framing subcontractor with field layout of all floors.

Description